Home | Contact Us | FAQ | Search & Site Map | Link to Us
Sign In | Join | Other 45 Sites in Network
Home
Discussion GroupsFormsForms ProgrammingQueriesModules / DAO / VBAReports / PrintingMacrosDatabase DesignSecurityConversionImporting / LinkingSQL Server / ADPMultiuser / NetworkingReplicationSetup / ConfigurationDeveloper ToolkitsActiveX ControlsNew UsersGeneral 1General 2
Access DirectoryToolsTutorialsUser Groups
Related Topics
SQL ServerOther DB ProductsMS OfficeMore Topics ...

MS Access Forum / Replication / July 2006

Tip: Looking for answers? Try searching our database.

ReplMan Needs to Run?

Thread view: 
Enable EMail Alerts  Start New Thread
Thread rating: 
Nigel Scott - 06 Jul 2006 10:57 GMT
Does ReplMan need to be loaded for scheduled synchs between a managed replica
and an unmanaged replica to occur?

Everything has been working fine with my Access XP synch until last week when
I closed Replication Manager (I'd left it loaded on the server for a few
months). Since then the scheduled synch between a managed hub and an
unmanaged replica have not occurred. The synchronizer is still loaded. I
launched Replication Manager and the scheduled synchs occurred again.

Thanks for any advice

Nigel
David W. Fenton - 07 Jul 2006 00:19 GMT
> Does ReplMan need to be loaded for scheduled synchs between a
> managed replica and an unmanaged replica to occur?

No. Only the synchronizer.

> Everything has been working fine with my Access XP synch until
> last week when I closed Replication Manager (I'd left it loaded on
> the server for a few months). Since then the scheduled synch
> between a managed hub and an unmanaged replica have not occurred.
> The synchronizer is still loaded. I launched Replication Manager
> and the scheduled synchs occurred again.

Huh. That shouldn't be the case. The schedule is managed by the
synchronizer, not by ReplMan.

The last time I had scheduled synchs, ReplMan was not loaded all the
time, only the synchronizer.

Signature

David W. Fenton                  http://www.dfenton.com/
usenet at dfenton dot com    http://www.dfenton.com/DFA/

Nigel Scott - 07 Jul 2006 07:52 GMT
Hi David

Thanks for the reply.

I thought that should be the case.

I'm back at the site next week and will investigate further.

Nigel

>> Does ReplMan need to be loaded for scheduled synchs between a
>> managed replica and an unmanaged replica to occur?
[quoted text clipped - 13 lines]
>The last time I had scheduled synchs, ReplMan was not loaded all the
>time, only the synchronizer.
 
Sign In
Join
My Latest Posts
My Monitored Threads
My Blog
My Photo Gallery
My Profile
My Homepage

Start New Thread
Enable EMail Alerts
Rate this Thread



©2008 Advenet LLC   Privacy Policy - Terms of Use
This website includes both content owned or controlled by Advenet as well as content owned or controlled by third parties.