> Does ReplMan need to be loaded for scheduled synchs between a
> managed replica and an unmanaged replica to occur?
No. Only the synchronizer.
> Everything has been working fine with my Access XP synch until
> last week when I closed Replication Manager (I'd left it loaded on
> the server for a few months). Since then the scheduled synch
> between a managed hub and an unmanaged replica have not occurred.
> The synchronizer is still loaded. I launched Replication Manager
> and the scheduled synchs occurred again.
Huh. That shouldn't be the case. The schedule is managed by the
synchronizer, not by ReplMan.
The last time I had scheduled synchs, ReplMan was not loaded all the
time, only the synchronizer.

Signature
David W. Fenton http://www.dfenton.com/
usenet at dfenton dot com http://www.dfenton.com/DFA/
Nigel Scott - 07 Jul 2006 07:52 GMT
Hi David
Thanks for the reply.
I thought that should be the case.
I'm back at the site next week and will investigate further.
Nigel
>> Does ReplMan need to be loaded for scheduled synchs between a
>> managed replica and an unmanaged replica to occur?
[quoted text clipped - 13 lines]
>The last time I had scheduled synchs, ReplMan was not loaded all the
>time, only the synchronizer.